|
Previous
Page
Project Management (PM)
• Construction Management of Amir Kabir Sugar Cane Factory at
a Nominal Capacity of 100,000-Tons per year.
(1999 - 2003).
• Construction Management of Petrochemical
Special Economic Zone Water Development and Transmision Project.
(1999 - 2002).
Domestic Wastewater
• Tehran Wastewater Project (Preliminary
Phase) in Cooperation with Sir Alexander Gibbs, John Taylor,
and Dr. Kouros.
• Cities of Booshehr, Hamedan, Sanandaj,
Kardkouy, Gonbad-E Kaavoos, Sar Bandar, Bandar-e Gaz and Mahshahr,
Saghi-Kelayeh, and Kelar-Abad Surface Water Collection Project.
• Hafshejan Wastewater Technical, Economical,
Socio-Environmental Preliminary Studies.
(2002 - 2003).
• Zahak and Jalegh Technical, Economical,
Socio-Environmental Studies.
(2002 - 2003).
Industrial Domestic Wastewater
• Industrial City of Alborz Wastewater Project (135 units and
80,000 population).
• Fakhr-e Iran Factories Industrial
Wastewater Projects.
• Astalak Factory Industrial Wastewater
Projects.
• Investigative Pilot Plant Research
Project For Treatment of Thickened Industrial Wastewater Using
Up-Flow and Conventional-Flow (down-flow) Anaerobic Reactors.
Structural Retrofitting and Repair
• Sarbandar and Marghzaar Water Treatment
Plant Structural Repair Project (concrete errosion elimination).
• Koot-e Amir Clarifier Repair (structural
repair).
• Astalak Factory Industrial Wastewater
Projects.
Others
• Kermaan and Yazd Airport Project.
Landing Lanes and Heat Vacuum and Air Conditioning for the
Main Terminal.
• Tehran Azadi Stadium Foundation and
Structural Calculations
• Construction Plans Electrical Power
Plants in 19 Cities of Iran .
Previous
Page
|